As ArcelorMittal Foundation Solutions, we have our own tube production facilities and stock locations. Tailored to the customer’s specific requirements, we can produce welded foundation pipes for the most challenging projects.
Why choose ArcelorMittal spirally welded tubes?
Production is 100% controlled and certified with either a 3.1 or 3.2 certificate according to EN 10204.
- Pipes can be produced with diameters up to 2850 mm and wall thicknesses up to 28 mm.
- All requested steel grades are possible due to our worldwide network of coil suppliers.
- Pipes can be produced and transported in one piece, a length of up to 53 meters. Longer is possible by splicing the piles in our workshops.
- Several specialised welding facilities are placed in line with the spiral mills for executing specific works like welding clutches or other steel parts and making butt welds.